Access and scheduling
A consolidation can involve three live spaces at once: two outgoing suites and the receiving floor. Each may have its own building rules, freight elevator window, and lease end date. The space whose lease ends first sets the order, so give us both surrender dates early. When one suite stays open while the other moves in, the crew keeps a staging area in each and avoids mixing them.
Where a building wants our Certificate of Insurance before it books the dock, each address gets its own copy. The receiving floor needs a current plan, clear aisles, and someone who can decide on the spot when a piece does not fit. While staff still use either suite, the crew can come in after hours or on a weekend on request.