Access and scheduling
Studios tend to move between deadlines. A permit submittal to the Pikes Peak Regional Building Department, a bid set, or a client review usually fixes the date, and the studio needs its drawings in reach until that package goes out. We plan around the gap your principals choose, often a Friday afternoon into a weekend.
The heavy pieces decide the route. Before booking, we measure a flat file unit, the plotter, and the biggest plan table against doors, elevator cabs, and corners at both suites. Older downtown and Old Colorado City buildings often have narrow stairs or small elevators, which can mean moving flat files one drawer unit at a time. Newer offices along North Nevada Avenue and in Briargate usually offer a parking lot close to a back entrance. Any insurance certificate or elevator booking the landlord asks for gets sorted before the date is final.


