Education, Civic & Community

College & University Moving in Colorado Springs

Swing-space moves, renovation decants, and whole-suite relocations timed to your campus calendar and run through facilities' dock and route rules.

(719) 357-5865
College & University moving in Colorado Springs: moving crew at work
  • 18+ Years Experience
  • 1,013+ Reviews 5-Star Rated
  • Family Owned Local Business

Start your free college & university move quote

verified For estimate purposes only credit_card_off No credit card required

Planning a College & University Move

Three Colorado Springs campuses, three calendars. UCCS and Pikes Peak State College run on semesters, so the big windows are winter break and the stretch between spring finals and the fall start. Colorado College teaches one course at a time on the Block Plan, which leaves short block breaks during the year and a longer window in summer. Pick the wrong week and the move lands on finals, orientation, or a block that has just begun.

Campus-scale moves are institutional rather than personal: a renovation that decants a whole floor into swing space and brings it back a year later, a department consolidating into a new building, or a college office leaving leased space off campus. Facilities usually owns the plan, with a department administrator on each end. We work from facilities' floor plans and work-order dates, move the suites in the order they release, and keep the institution's property tags visible so the asset inventory still matches afterward. See the education and civic hub for smaller campus settings.

Who usually signs off
Department administrator or campus facilities coordinator who approves the room list and coordinates receiving access
Timing that works
UCCS and Pikes Peak State College work on semesters, so winter break and the weeks after spring finals carry most moves; Colorado College runs the Block Plan, so dates key off block breaks and summer.

What typically moves

  • Swing-space office suites Desks, files, and seating move out ahead of the contractor, then back again to the renovated floor, tagged both times to the same final room.
  • Classroom and seminar furniture outside the registrar's schedule Tables, tablet-arm chairs, and lecterns move only when the room drops off the schedule for the term or block.
  • Department reception counters and student-service desks Freestanding counters move with the suite; anything fastened down waits for facilities to release it.
  • Tagged furniture and equipment on the asset inventory Property tags stay visible and uncovered so campus inventory staff can check pieces off at the destination.
  • Surplus furniture headed to the campus surplus process Moved only to the surplus location facilities names; the institution decides what is sold, reused, or disposed of.
  • Student-lounge and study-area seating Soft seating is wrapped in clean pads and staged last, since those spaces often stay open until the final days.

Access and scheduling

Facilities sets the rules, and they differ by campus and by building. Expect a loading-dock reservation, a parking or vehicle permit for the truck, a set cart route, and an elevator booked through the building manager, and expect the rules at the sending building to differ from the receiving one. Summer is not an empty campus: camps, orientation, summer courses, and the renovation contractors themselves compete for docks and elevators.

Renovation moves also hang on the contractor's dates. A decant has to finish before demolition starts, and the move back waits on the certificate of occupancy and punch list, which can slip. We plan both legs when we book the first, and reconfirm the return once facilities has the building back. For a college office in leased space off campus, the landlord may want a Certificate of Insurance.

Protection and handling

Campus buildings are shared, so the hallways get protected along with the furniture: corner guards at the tight turns, floor runners from the dock to the elevator, and door-stop control where fire doors would otherwise be propped. From October through April, snowmelt comes in on every boot, so runners go down before the first cart does.

Every piece carries a building, floor, and room from the facilities plan. During a decant we add a second tag for the swing-space room, so a desk that spends a year elsewhere goes back to the right office. Records rooms are packed and sealed by the offices that own them, and the crew moves the cartons closed. At staff desks our crew moves and reconnects each computer and printer; campus IT handles accounts, the network, and classroom technology.

Who does what

Some of this job belongs to other trades. The written plan names each one.

Mounted classroom displays, projectors, and lecture-hall technology
Campus IT or the AV integrator removes and reinstalls them. The crew takes the loose furniture after the room is cleared.
Demolition, build-out, and fixed casework
The renovation contractor handles it. We move contents out before their start date and back after their punch list.
Asset tagging and surplus decisions
Campus property or surplus staff own the inventory. We keep tags visible and deliver surplus where they direct.

Not part of our work

  • Moving laboratory instruments, chemicals, or research materials, which the department and its vendors handle.
  • Deciding what becomes surplus or disposing of institutional property outside the campus process.

Around Colorado Springs and El Paso County

UCCS sits on the north side off North Nevada Avenue, Colorado College is just north of downtown along Cascade Avenue, and Pikes Peak State College spreads across several campuses, on the south side, the north side, and downtown. Each campus has its own facilities office, dock rules, and parking enforcement.

The crew that shows up

Two iHaul iMove box trucks backed in with their rear doors openTwo iHaul iMove movers raising a large wood tabletop togetheriHaul iMove crew loading a padded item into the truck as snow falls

College & University Moving FAQs

Another question? Call (719) 357-5865.

Can you handle both legs of a renovation decant, out to swing space and back?

Yes. We plan both moves when the first is booked, tag each piece with its swing-space room and its final room, and keep the same labels on file for the return. The return date follows the contractor's punch list and occupancy sign-off, so we hold a target and reconfirm once facilities has the renovated floor back.

How does the Colorado College Block Plan change a move date?

Blocks run back to back with only short breaks between them, so a department rarely gets a long quiet week during the year. Offices can move over a block break if the rooms are packed ahead, while classrooms and larger suites usually wait for summer. Send us the block calendar and the rooms needed on the next block's first day.

Will our property tags still match the campus inventory after the move?

They should. Our crew does not remove or cover tags, and each piece travels to the room on the facilities plan. If your property office wants a check-off list, send the tag numbers by room and the receiving contact can confirm them as pieces are placed, rather than hunting for them a month later.

Can you move surplus furniture to the campus surplus location during the same job?

Yes, if facilities names the pieces and the destination. We keep surplus on its own load so it never mixes with furniture going to the new suite, and deliver it to the warehouse or holding area the campus uses. What happens to it afterward is the institution's decision under its own surplus rules.

Plan your business move

Tell us both addresses, the building rules you know about, and the dates you cannot move. We will send back a written plan and estimate.

Call (719) 357-5865

Open 24 hours a day

Call Now call 719-357-5865