Warehouse & Light Industrial

Contractor Trade Shop Moving in Colorado Springs

Tool cribs, gang boxes, benches, and material racks moved around morning dispatch, while your fleet, trailers, and gas cylinders stay with you.

(719) 357-5865
Contractor Trade Shop moving in Colorado Springs: moving crew at work
  • 18+ Years Experience
  • 1,013+ Reviews 5-Star Rated
  • Family Owned Local Business

Start your free contractor trade shop move quote

verified For estimate purposes only credit_card_off No credit card required

Planning a Contractor Trade Shop Move

A trade shop's day starts at the crib. Plumbers, electricians, HVAC techs, and framing crews pick up tools, fittings, and material before dawn and are on job sites by the time the office opens. A shop move that leaves the crib half packed on a weekday morning puts every crew behind. So we plan around dispatch: the shop moves after the trucks leave on the last day and is set up before they come back to load.

What moves is everything inside the building. Tool crib cabinets and their shelving, gang boxes and job boxes, fabrication and repair benches, parts drawers, and freestanding racks of pipe, conduit, wire, and fittings. Your shop manager decides what stays on the trucks and what comes off them. Service vans, pickups, trailers, and their contents stay with your drivers. Compressed gas cylinders such as acetylene, oxygen, and refrigerant recovery tanks go back to your gas supplier or move under your own procedure, not on our truck.

Who usually signs off
Contractor owner or shop manager, with the tool crib lead and field supervisor approving the release order
Timing that works
Friday afternoon after the trucks roll out, through the weekend, so crews load out from the new shop on Monday; avoid the spring rush and the first hard freeze for HVAC and plumbing shops.

What typically moves

  • Tool crib cabinets and issue shelving Cabinets emptied or locked per your crib lead's call, shelving tagged by bay so checkout locations stay the same.
  • Gang boxes and rolling job boxes Locked by your crews, moved on dollies, and set where your shop layout puts them.
  • Fabrication and repair benches Vises and bench grinders unbolted by your staff where needed; the bench tops travel padded.
  • Freestanding material racks Unloaded and bundled by size, then rebuilt at the new shop with bundles going back in the same order.
  • Pipe, conduit, and trim stock Bundled and tagged by size in lengths that fit our truck, with long stock loaded along the floor.
  • Parts bins and fastener drawer cabinets Drawers taped or trays stacked so fittings, connectors, and fasteners stay sorted.
  • Shop office desks and plan tables Moved with the dispatch office so estimating and scheduling keep running.

Access and scheduling

Most trade shops sit in flex buildings with a roll-up door, a yard, and neighbors who also run trucks at dawn. We check the door height and width, the yard's turning room with trailers parked in it, and where our box truck can stand without blocking your fleet. Long stock dictates a lot: twenty-foot pipe and conduit lengths either ride on your own rack trucks or get cut or bundled to fit.

The shop manager and dispatcher set the order. Usually slow-moving stock and overflow racks go first, midweek, while crews keep working from the crib. The crib, benches, and dispatch office move last, from Friday afternoon into the weekend. Send us the names your new landlord wants on our insurance certificate. Tell your supply houses about the new address so Monday's deliveries land at the right shop.

Protection and handling

Trade shop contents are heavy and hard, and mostly not fragile, so protection is about people, floors, and the tools that are fragile. Pipe and conduit bundles are strapped so ends cannot slide. Heavy bins travel low on the truck with light cartons on top. Power tools stay in their cases, and anything with a blade, bit, or battery is boxed so nothing loose rides in the load.

Test instruments such as meters, recovery gauges, and laser levels are packed by the techs who use them, or boxed in padded cartons with their cases closed. At the new shop, racks are rebuilt level and checked before material goes back on, and crib shelving goes up in its original bay order so checkout stays familiar. Your crib lead checks the cabinets against their list on Monday morning.

Who does what

Some of this job belongs to other trades. The written plan names each one.

Service vans, pickups, trailers, and truck-mounted racks
Your drivers move the fleet and everything stowed on it. We do not drive or load company vehicles.
Compressed gas cylinders and refrigerant tanks
Your gas supplier swaps or moves them, or your team transports them under your own safety procedure.
Air compressors, dust collection, and wired shop equipment
Your electrician and the equipment vendor disconnect and reinstall them, with rigging if needed.

Not part of our work

  • Moving vehicles, trailers, or anything stowed on them.
  • Transporting compressed gas, fuel, or refrigerant.
  • Forklift work or rigging of heavy shop machinery.

Around Colorado Springs and El Paso County

Colorado Springs trade shops cluster in east-side flex parks off Marksheffel Road and Powers Boulevard, in older yards near North Nevada Avenue, and up north toward Monument and Northgate. Spring brings the building rush, and the first hard freeze keeps HVAC and plumbing crews busiest, so late summer or midwinter weekends usually suit a shop move. Snow in the yard means we clear a path with your team before we load.

The crew that shows up

Padded door frame and a floor runner laid out before a moveTwo iHaul iMove box trucks backed in with their rear doors openTwo iHaul iMove movers raising a large wood tabletop together

Contractor Trade Shop Moving FAQs

Another question? Call (719) 357-5865.

How do we keep crews supplied while the tool crib is being moved?

Move the crib last, after the trucks leave on the final day, and have it set up before the next morning's load-out. Overflow stock and slow items move earlier in the week while crews keep using the crib. Your crib lead can stock each truck with a day's extra material before the move.

Will your crew move our service vans and trailers with the shop?

No. Your drivers move the fleet, and anything stowed on the vans stays on them. We plan our truck's parking around your fleet at both yards, and we can load shelving or benches that come off a van once your team has emptied it.

Should we empty every parts drawer before moving its cabinet?

Not always. Light drawer cabinets can travel with drawers taped shut if the cabinet is sturdy and the weight stays safe to lift. Heavy or tall cabinets get emptied into labeled trays. We decide cabinet by cabinet during the walk-through and tell your shop manager which ones need emptying.

What happens to material racks that are attached to the building?

Racks bolted to the floor or wall belong to whoever installed them, or to the landlord if the lease says so. Your steel or shelving installer takes them down and sets them at the new shop. We unload and bundle the material and put it back on the racks once they are standing.

Plan your business move

Tell us both addresses, the building rules you know about, and the dates you cannot move. We will send back a written plan and estimate.

Call (719) 357-5865

Open 24 hours a day

Call Now call 719-357-5865