Access and scheduling
Weight is the planning problem. Measure every door, ramp, and threshold on the route at both addresses, and check whether the new floor is on grade or upstairs, since an elevator or a mezzanine changes what can go where. We plan truck loads so heavy free weights sit low and forward, and we bring enough carts that plates never travel in cardboard boxes, which tear.
The technician's visits bracket our work: one to prepare powered and cable machines at the old gym, one to reinstall and test them at the new one. Book both before our date. If the new flooring is being installed, ask the installer when it can take rolling loads of this weight, and hold the equipment day until then.