Access and scheduling
Two landlords means two sets of rules. Ask each property manager for loading hours, where a box truck can park, whether an elevator needs reserving, and what insurance paperwork they want on file. During a retrofit the contractor also controls the receiving building until handover, so their superintendent decides which entrances and corridors are open and whether our crew can work alongside trades finishing the punch list.
Plan the date from the building, not the calendar. Until the new space is cleared for school occupancy, move only what can sit in a released staging room. Camps and teacher setup days fill late July, and the old lease end date is the hard stop. If both buildings allow it, the crew can load on an evening or a weekend.